Saturday, 15 December 2012

Revised plans on Portal

Just to let you know that Freetricity have submitted revised plans on the planning portal. To have a look at them go to here

They are pretty confusing as there doesn't seem to be any change control - e.g document dates say 24.09.2012 and no revision history either so you have to play "spot the difference". As far as I have been able to establish, the main changes are
1. 9 short rows of panel removed outside houses at end of Pine Close, to be replaced by a wildflower meadow
2. Mature tree removed and additional panels added to parcel 2-3. This is shown on the new Site Block Plan
3. Plans for screening along the rec have have been submitted. This seem to be a 1 metre mound planted with a mixture of trees and some hedgerows.
3. Inverters have disappeared from all the revised drawings!!

We are reviewing these docs, but thought you might like to take a look for yourself. I have uploaded the Detailed Planting Proposal as this is probably the document of most interest.

If you had previously submitted comments you should have received a letter by now from HBBC advising you that plans have changed and telling you the closing date for comments remains unchanged - i.e. 23rd Dec 2012.